Storm-water network for an existing resort – 3,000 L.M

Earthworks, concrete and UPVC/GRP pipe installation for a 3,000-linear-metre storm-water network.

Storm-water network for an existing resort – 3,000 L.M

We built a 3,000 L.M storm-water network inside an existing resort in Riyadh between October 2020 and March 2021, keeping the resort operational.

The project included excavation 2 – 5 m deep and removal, backfilling with compaction, plain and reinforced in-situ concrete for manholes, catch basins and gully inlets, and pipe installation of 400 – 600 mm UPVC and 900 mm GRP.