InfrastructureStorm-water network for an existing resort – 3,000 L.M
Earthworks, concrete and UPVC/GRP pipe installation for a 3,000-linear-metre storm-water network.
View projectStorm-water networks, earthworks, concrete manholes and pipe installation.

We deliver infrastructure from excavation to pipe laying and backfilling: earthworks 2 – 5 m deep, backfilling with compaction, plain and reinforced in-situ concrete for manholes, catch basins and gully inlets, and UPVC and GRP pipes of 400 – 900 mm.
We built a 3,000 L.M storm-water network for an existing resort in Riyadh (2020 – 2021) while the resort stayed operational.
Yes — we built a 3,000 L.M network inside an operating resort, phasing works to minimise disruption.
400 – 600 mm UPVC and up to 900 mm GRP, depending on design.
Tell us about your idea and we will come back with an initial study and quotation quickly.